KBP - ASHLEY CRK TO W RESERVE DR Project KBP ? Ashley Crk to W Reserve Dr will perform the following work: ? 50? long, 0.20? deep mill/fill full width at both sides of Ashley Creek Bridge (RP 3.62) and Old Reserve Dr. Bridge (RP 6.98). ? 50? long, 0.20? deep mill/fill full width at south end of US Hwy 2 Bridge. The north end of US Hwy 2 Bridge will receive a 40? long (up to the start of the impact attenuator in the median), 0.40? deep mill/fill full width. ? 200? long, 0.20? deep mill/fill of the four travel lanes and center median at a storm drain settlement location at RP 5.32 (just north of the Three Mile Drive interchange, adjacent to the gore area of the southbound off-ramp). ? 150? long, 0.20? deep mill/fill full width at a pedestrian underpass settlement location at RP 6.93 (at the Old Reserve Dr. Interchange). ? 50? long, 0.20? deep mill/fill full width at SB on-ramp and NB off-ramp across the pedestrian underpass settlement location at RP 6.93 (at the Old Reserve Dr. Interchange). ? Full width crack seal, chip seal and fog seal on the Kalispell Bypass (KBP) from reference post (RP) 3.6 to RP 7.5. ? Full width crack seal, chip seal and fog seal on the Interchange ramps for US Hwy 2, Three Mile Drive, Four Mile Drive, and Old Reserve Drive. ? Crack Seal and fog seal all shared-use paths, as shown in plans. ? New pavement markings and centerline rumble strips (in mill/fill areas on KBP only). The project begins at RP 3.6 (50? south of the southern bridge end of Ashley Creek Bridge) on the Kalispell Bypass (N-109, Alt US-93) and extends northbound for 3.9 miles to RP 7.5 (at the beginning of the PCCP, just west of the W. Reserve Dr. intersection). This project is in Flathead County.
KBP - ASHLEY CRK TO W RESERVE DR Project KBP ? Ashley Crk to W Reserve Dr will perform the following work: ? 50? long, 0.20? deep mill/fill full width at both sides of Ashley Creek Bridge (RP 3.62) and Old Reserve Dr. Bridge (RP 6.98). ? 50? long, 0.20? deep mill/fill full width at south end of US Hwy 2 Bridge. The north end of US Hwy 2 Bridge will receive a 40? long (up to the start of the impact attenuator in the median), 0.40? deep mill/fill full width. ? 200? long, 0.20? deep mill/fill of the four travel lanes and center median at a storm drain settlement location at RP 5.32 (just north of the Three Mile Drive interchange, adjacent to the gore area of the southbound off-ramp). ? 150? long, 0.20? deep mill/fill full width at a pedestrian underpass settlement location at RP 6.93 (at the Old Reserve Dr. Interchange). ? 50? long, 0.20? deep mill/fill full width at SB on-ramp and NB off-ramp across the pedestrian underpass settlement location at RP 6.93 (at the Old Reserve Dr. Interchange). ? Full width crack seal, chip seal and fog seal on the Kalispell Bypass (KBP) from reference post (RP) 3.6 to RP 7.5. ? Full width crack seal, chip seal and fog seal on the Interchange ramps for US Hwy 2, Three Mile Drive, Four Mile Drive, and Old Reserve Drive. ? Crack Seal and fog seal all shared-use paths, as shown in plans. ? New pavement markings and centerline rumble strips (in mill/fill areas on KBP only). The project begins at RP 3.6 (50? south of the southern bridge end of Ashley Creek Bridge) on the Kalispell Bypass (N-109, Alt US-93) and extends northbound for 3.9 miles to RP 7.5 (at the beginning of the PCCP, just west of the W. Reserve Dr. intersection). This project is in Flathead County.
Project Roles
Owners
- Owner MONTANA DEPARTMENT OF TRANSPORTATION, 2705 AIRPORT RD HELENA MT 59601
Your local Gomaco dealer |
---|
Tri-State Truck & Equipment Inc |
American Construction Supply |